Supply, install, commissioning, start-up and operation of all infrastructure works (Sewage, Irrigation and Firefighting) in the site layout with total piping length 2150 m. firefighting pipes from HDPE PN 16. Sewage pipes from UPVC PN 10. The project was consisting of 79 sewage manhole and 15 catch basins.
Supply, install, commissioning, start-up and operation of all infrastructure works (Sewage, Irrigation and Firefighting) in the site layout with total piping length 2150 m. firefighting pipes from HDPE PN 16. Sewage pipes from UPVC PN 10. The project was consisting of 79 sewage manhole and 15 catch basins.